Glasgow Standard Tram

Preserving Glasgow Tram No.488

It's history and restoration progress in the UK

Horse tram services started 19 August 1872
Electric traction from 13 October 1898 until 4 September 1962
Tramway abandonment's started in 1926, with major route closures from 1956 onwards
Trolleybuses introduced 3 April 1949 - Abandoned 27 May 1967


Tour Guide

Back Previous Page | Next Page Next

Full Size Pictures Available

All pictures by © Glenn Williams

Throughout this site you can click on most thumbnails to view the picture in a larger format.

Return to the web site using the hyperlink in the bottom right-hand corner or click on the enlarged picture to view the next one.

On an Apple device [iPad/iPhone] this facility will not work correctly if the page being viewed has been enlarged.

The Windows operating system allows you to go into full screen mode and is to be recommended for this site. Just initially press F11 on your keyboard to enter into that mode.


Take Care

Restoration Progress to January 2015

The following has been achieved between the months of September 2014 to January 2015.

TOP DECK
•  In storage with planned move into the workshop once the lower deck is completed.

LOWER DECK - External work
•  Main body primed and painted up to final coat of coloured paints.
•  Genuine Glasgow crests sourced and applied to body side.
•  Lining on body ends and sides started.
•  Balcony levels set and now bolted up.
•  End dash metalwork drilled, refitted, and painted on inside face.
•  Dash windows re-fitted, glass installed, primed and final paint.
•  Stairs bottom step/mount repaired, painted and fitted.
•  Compressor box repairs started
•  Balcony bell pushes painted and fitted. Awaiting wiring up.
•  Balcony light pa tresses fitted. Light yet to be sourced.

LOWER DECK - Internal work
•  All ventilator windows fitted.
•  All ceiling panels have artwork applied and varnished.
•  All mouldings re-fitted.
•  End half access doors varnished and re-fitted.
•  End full access doors varnished pending re-fitting.
•  Teak side panes fitted.
•  Lower softwood painted areas finished.
•  Repairs to floor started.
•  Bell pushes [mostly newly manufactured to original design] fitted with spring switches. Awaiting electrical connections.
•  Lighting pa tresses re-fitted. Awaiting electrical connections.
•  Sliding doors have gold leaf applied and are ready for re-fitting.
•  Blackout blinds ready for re-fitting.
•  All brass work cleaned back, polished and lacquered.
•  Ticket boxes repaired and repainted.
•  Grab rail varnished and re-fitted with leather grab straps.